MSI Creator A11UE-213XFR RAM upgrade specifications

The MSI Creator Z16 series model A11UE-213XFR features DDR4-SDRAM memory upgrade specifications with 2x SO-DIMM slots. Maximum RAM capacity reaches 64 GB, supporting DDR4-SDRAM modules operating at 3200 MHz frequency. The SO-DIMM form factor ensures compatibility with mobile memory standards. Users requiring memory expansion can utilize both slots for upgrade configurations within the specified maximum capacity constraints and frequency specifications.

Memory Upgrade Specifications

SpecificationValue
Memory slots2x SO-DIMM
Form factorSO-DIMM
Memory typeDDR4-SDRAM
Frequency3200 MHz
Maximum RAM64 GB
Voltage1.2V
Number of pins260-pin
InterfacePC4
PC Speed RatingPC4-3200 (PC4-25600)
Bandwidth25.6 GB/s
Laptop Release date04 November 2021

Additional Notes

  • The MSI Creator A11UE-213XFR contains 2 SO-DIMM slots operating at 3200 MHz, establishing a theoretical maximum aggregate bandwidth of 51.2 GB/s per channel under optimal conditions, though real-world throughput remains constrained by the DDR4 architecture's inherent latency characteristics.
  • Upgrading to the 64 GB maximum requires matching DDR4-3200 modules with identical timings and voltage specifications; mismatched secondary timings between existing and new SO-DIMMs can trigger automatic BIOS downclocking, negating performance gains from higher-capacity modules.
  • The dual-slot configuration means asymmetrical capacity pairings (32 GB plus 16 GB, for example) result in single-channel operation for the smaller module, creating measurable latency penalties in memory-intensive workloads compared to symmetrical configurations.
  • SO-DIMM replacements require full system shutdown and typically involve removing the keyboard or access panel; warranty retention depends on whether the system design permits user-accessible memory compartments without breaking tamper seals.
  • DDR4-3200 SO-DIMM availability is declining as OEM production shifts to DDR5; sourcing verified 64 GB dual-module sets from reputable manufacturers requires advance planning beyond typical component procurement timelines.